What could be interesting for you?

Asfinag bridge inspections 2016, Austria

Asfinag bridge inspections 2016
Asfinag bridge inspections 2016
Asfinag bridge inspections 2016
Asfinag bridge inspections 2016
Asfinag bridge inspections 2016

Project description

The job included a total of 55 bridge inspections along the A10 Tauern autobahn in Austria. In each case, the following were inspected and evaluated: The substructure, the superstructure, the bearing and joints, road transitions (if any), the road surface, the sealing, drainage, edge beams, and any other such features as railing or guide planks.

Project information

Client
Asfinag Bau Management GmbH, Wien, Austria

Our services
Bridge inspection in accordance with RVS Guidelines and Ordinances for Street Construction 13.03.11

Contact person
Dipl.-Ing. Walter Weis, B.Sc.

Engineer
Dipl.-Ing. Walter Weis, B.Sc.

Photocredits

Bergmeister